Condition: | New |
---|---|
Certification: | CE, ISO9001 |
Standard: | DIN, GOST |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Mould Performance and Features
1) Equipment: We own Stamping machines, Hydraulic press machines, Auto-Turning machines, CNC-Turning machines, Milling machines,Precision wire cutting machines, more than 160 sets in total;
2) Material: iron, carbon steel, stainless steel, brass, copper, alloy steel, aluminum, cold rolled steel with various plating;
3) Surface treatment: kinds of plating (Zinc, Nikel, Chrome, Tin, Ag); Painting, Powder, Anodizing, E-coating, Silkscreen, Heat treatment, Black oxid; 4) Standard/ specification: OEM service as per customers' requests, within-house tooling design & fabricating;
5) RoHS compliance for export;
6) Quality assurance in accordance with ISO9001:2008;
7) Concurrent engineering capability on product design;
8) Just-in-time manufacturing capability to meet customer's requirement;
9) Tailor-made packaging method according to customer's requirement.
Item |
Mould parts |
Place of Origin |
China |
Province |
Hebei |
Brand Name |
Hongmaoda |
Model Number |
Customized |
Shaping Mode |
Milling |
Product |
Vehicle Part |
Material |
OEM |
Product Material |
Metal,steel |
Packing |
The wooden box |
1. What is the power supply of the heat exchanger making machines?
The power supply of heat exchanger making machines is to be decided by the customer's side. We are able to adjust the power supply (volt, and phase) through a transformer or of the customer's voltage directly so that the melting furnace is ready for use at the end user's site.
2. What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc.
3. What is the payment term?
The payment term is 40% down payment, and 60% before delivery (T/T mode).
4. What is the delivery time?
The delivery time of the machine is 30-60 days after receipt of down payment.
5. why should you buy from us not from other suppliers?
1. We are the manufacturer which offer products with competitive price to trade companies.
2. We have more than 10 years manufacture experience
3. According to customer requests and products to produce.
Suppliers with verified business licenses